5 Mw Fired Water Boiler Central Heating

5 Mw Fired Water Boiler Central Heating

  • SET OF TENDER DOCUMENTS (ON LINE)

    5. Specification of the item [Thermax Make 600 Kg/Hr capacity Boiler (IBR, Oil fired) along with water softener, water & Fuel tank, Chimney, pipelines, valves, gauges,Steam pressure reducing station etc. with other accessories]. 6. AFFIDAVIT [To be furnished in a Twenty Rupees Non …Learn More

  • BILL OF QUANTITIES FOR ROAD WORKS

    road with bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade VG - 10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size (Passing 11.2 mm sieve and retained on 2.36 mm sieve) per 100 sqm of road surface, including rolling and finishing with power road roller all complete. 4,500 Learn More

  • Munawar Hassan - Mechanical Maintenance Engineer - Pacific

    Pacific Oil Mills pvt Ltd. Jul 2015 - Present6 years 1 month. Karachi. - Working with Pacific Oil Mills Port Qasim Karachi 150 TPD (ALFA LAVAL) two stages Neutralization and physical Oil refinery consists of Neutralizing, Bleaching, De Odorized, HP boiler and Low Pressure fire tube boiler, Variety of pumps, screw type air compressor, Generators Learn More

  • Equipment Use Permits in New York | Equipment Use Permit Cards

    New heating systems are registered with an APC 5-0 Certificate to Operate, and existing units use the APC 314 Application to Renew. Previously, the NYC Department of Buildings managed a separate registration for boilers (BO), fuel burners (FB) and fuel storage (FS). However, all these units are now managed under the category of boiler equipment Learn More

  • Bill Of Quantities Solar Water Pump

    Quantities Of Water Would Take Longer Time To Heat Up This Boiler Might Or Might Not Own A Tank Which Water Is Heated In' 'Lot 2 Bill of Quantities Oshana Ohangwena and Oskikoto May 7th, 2018 - Lot 2 Bill of Quantities Oshana Ohangwena and Oskikoto Regions Item No Payment clause Description Unit Quanti ty Rate N Amount N 1 SECTION 1 PRELIMINARY Learn More

  • Building: RECONSTRUCTION OF CENTRAL HEATING IN …

    channel for drainage of smoke from the boiler room. pcs. 1 2.8 Dismounting and removal of existing light fuel oil boilers Podvis with capacity of 500 kW.* (cca. 1000 kg) pcs. 2 2.9 Dismounting of existing burners and parts of oil installation in the boiler room.* pcs. 2 2.10 Cutting off existing pipings in the boiler room toLearn More

  • SPORTS HALL - LJUBOVIJA Bill of Quantities

    Bill of Quantities. N: o: Description: U/M: Q-ty: Unit price Total: 10 Paint the walls using oil based paint with all the necessary preparatory activities, scraping and rubbing. Insulate pipe network in the boiler room using mineral wool, minimum thickness 50mm, with Al-sheet coating, 0.7mm thick.Learn More

  • Canh Phan - MEP Manager - RU Engineering - LinkedIn

    - Design Boiler, drainage and water supply - Design Medium and Low Voltage, Tel & Data, MATV, Fire Alarm Fitting, CCTV system. - Make costing, estimates and biding proposal for new project. - Prepare design specifications, requisitions, data sheets, design calculations, bill of quantities…Learn More

  • World Vision International Specification and Bill of

    water boiler item 1 5 provide and install a heat pump (grundfoz of type UPS 32-70 180) and connect it to the hot water boiler. item 1 World Vision International Specification and Bill of quantities for Heating System Total Price TTC: Vis i o n . Author: Douha Boufakhreddine Created DateLearn More

  • Engr. Franklin Chikezie Ugwueke - Engineering Manager

    • Team lead supply, installation and maintenance of 3 Ton Yorkshireman Steam Boiler (Byworth) 2013 – MRS Oil Nig. Plc. • Team lead design, construction and maintenance of Fuel Service Station at Asokoro Abuja for MRS Oil Nig. plc. 2010. • Team lead conceptual design of a 500,000 liters fuel dump and filling point for Chevron Oil Nigeria Learn More

  • Annexure BILL OF QUANTITIES - BBMP

    STEAM BOILER ROOM 12 STEAM BOILER (LPG operated) 8mm inner shell, outer 6mm - 3 " & 4" tata class pipe, top 8mm verticle pipe 10mm flange set, MS Flout Box, SS Stand, Including Boiler Fittings it can be square or round. CAPACITY : 100 KGS /HR (81 KW) 2 60 LPG Page 3 of 8Learn More

  • ARCHITECTURAL SERVICES DEPARTMENT MODEL BILLS OF

    Steam Boiler System MODBQ.30/1 - 10 Liquefied Petroleum Gas Installation MODBQ.31/1 - 9 Fuel Supply System MODBQ.32/1 - 8 Swimming Pool Water Treatment Installation MODBQ.33/1 - 15 Medical Gas Installation MODBQ.34/1 - 30 Prime Cost, Provisional and Contingency Sums MODBQ.35/1 - 9Learn More